Description
Black Dog Long Lead 5m
12mm wide, 5 Meters long, Small Snap Hook.
20mm wide, 5 Meters long, Medium Snap Hook.
The ideal tool for training dogs and puppies for recall, or allowing dogs to roam in the park, or the beach, while still maintaining lead control.
An excellent light weight long lead that enables the dog to learn recall without the weight of a heavy lead.
Enjoy the Black Dog Wear 5 meter Long Lead.